29.01.18
Development Update: 5 kW Air Cooled Stack (IDP13)

Here at Bramble Energy, we’ve been quite busy over the last few months developing a range of different sized systems and products. We’re particularly proud of the progress that’s been made so far in our IDP13, Innovate UK funded project to produce a 5 kW air cooled stack.
The system pictured above is made up entirely of manufactured modules, unlocking a key element of our business. Through extensive design and iteration, we have been able to optimise our module design and performance; coupled with the fantastic team at our PCB manufacturer (ZOT Engineering), we have completely standardised the module manufacture. Standardising this process reduces the risk of errors and manufacturing defects and cuts down on waste. In turn, this helps us to produce our stacks more efficiently, quickly and of course beautifully!
Stay tuned for more progress updates, follow us on Twitter @brambleenergy and sign up for our newsletter at our brand new website, www.brambleenergy.com.